{"id":9862,"date":"2026-04-23T08:00:26","date_gmt":"2026-04-23T08:00:26","guid":{"rendered":"https:\/\/ofero.news\/?p=9862"},"modified":"2026-04-23T08:00:26","modified_gmt":"2026-04-23T08:00:26","slug":"contract-awarded-for-final-section-of-romanias-a8-motorway-including-first-link-over-prut-river","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=9862","title":{"rendered":"Contract awarded for final section of Romania\u2019s A8 motorway, including first link over Prut River"},"content":{"rendered":"<p>The National Company for Road Investments CNIR said it awarded the contract for the final section of the A8 (Union) motorway, marking a key milestone for one of Romania\u2019s most important infrastructure projects. The segment will also include the first motorway connection across the Prut River into Moldova.<\/p>\n<p>\u201cWe are achieving a milestone for the T\u00e2rgu Mure\u0219-Ia\u0219i-Ungheni motorway project: the selection of the contractor for the final kilometers to be built in Romania, as well as the first motorway section crossing the Prut River, a premiere we are marking under the SAFE Programme,\u201d reads the CNIR announcement.<\/p>\n<p>The RON 3.57 billion (excluding VAT) contract was granted by the CNIR to a consortium led by Italy\u2019s ITINERA, together with ICM S.P.A and Saipem.<\/p>\n<p>The project includes the design and construction of a 15.5 km section between Ia\u0219i and the Prut River bridge at Ungheni, as well as a 5 km motorway segment on Moldovan territory.<\/p>\n<p>The contract will be carried out over 46 months, including 10 months for design and 36 months for construction. A priority segment of 2.77 km between the Gol\u0103ie\u0219ti interchange and the Ungheni bridge is expected to see accelerated progress.<\/p>\n<p>The new section will include 14 bridges and overpasses, two tunnels &#8211; one of them measuring 1.76 km &#8211; and two major interchanges, including links to Ia\u0219i\u2019s regional hospital and airport, CNIR said.<\/p>\n\n<p>irina.marica@romania-insider.com<\/p>\n<p>(Photo source: Facebook\/<em><a href=\"https:\/\/www.facebook.com\/CNIRSA?__cft__%5B0%5D=AZZUFqpx9zxpMLJ9W0TC8L7KzYnxNFdBFBRQjdMolNwWTLqhrgVgDCrD_yDARM3ue-yzrc0sFchnuYWyreT4e-jaQ2tAF2iaRfOkpvgGoOMmnxxi16vMXlIhln3p3o_sWCVG9R6O5WWSAGTIR0S8docITylYImp9waRhDf9Xrr-NcV79BK5y0DF17DgwDpPQ_rM&amp;__tn__=-UC*F\">Compania Na\u021bional\u0103 de Investi\u021bii Rutiere<\/a>)<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>The National Company for Road Investments CNIR said it awarded the contract for the final section of the A8 (Union) motorway, marking a key milestone for one of Romania\u2019s most important infrastructure projects. The segment will also include the first motorway connection across the Prut River into Moldova. \u201cWe are achieving a milestone for the [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-9862","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/9862","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=9862"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/9862\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=9862"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=9862"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=9862"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}