{"id":9459,"date":"2026-03-25T08:00:43","date_gmt":"2026-03-25T08:00:43","guid":{"rendered":"https:\/\/ofero.news\/?p=9459"},"modified":"2026-03-25T08:00:43","modified_gmt":"2026-03-25T08:00:43","slug":"romanias-hidroelectrica-seeks-contractor-for-new-55-mw-power-plant","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=9459","title":{"rendered":"Romania\u2019s Hidroelectrica seeks contractor for new 55 MW power plant"},"content":{"rendered":"<p>Hidroelectrica (BVB: H2O) launched on March 24 the procurement procedure for the design, supply, and installation of mechanical and electrical equipment for the Nehoia\u015fu II Hydroelectric Power Plant, with a nameplate capacity of 55 MW. The contract will also include the expansion of the 110 kV transformer station within the Surduc-Siriu Hydropower Development.\u00a0<\/p>\n<p>The project represents one of the company&#8217;s strategic investments in developing renewable energy production capacities and consolidating Romania&#8217;s energy security, according to a press release quoted by <a href=\"https:\/\/www.zf.ro\/burse-fonduri-mutuale\/bursa-hidroelectrica-cea-mai-mare-companie-din-romania-scoate-la-23099647?mc_cid=f6e2363568&amp;mc_eid=cd1f92f96c\" target=\"_blank\">Ziarul Financiar<\/a>.<\/p>\n<p>The contract, estimated at approximately EUR 49.5 million (excluding VAT), will be awarded as a turnkey contract and will include design, manufacturing, delivery, assembly, testing, commissioning, and training of operating personnel.\u00a0<\/p>\n<p>The estimated implementation period is 44 months, the project being carried out within the Surduc-Siriu Hydropower Development, located in Buz\u0103u, Vrancea, and Covasna counties.<\/p>\n<p><em>iulian@romania-insider.com<\/em><\/p>\n<p><em>(Photo source: Inquam Photos\/Octav Ganea)<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Hidroelectrica (BVB: H2O) launched on March 24 the procurement procedure for the design, supply, and installation of mechanical and electrical equipment for the Nehoia\u015fu II Hydroelectric Power Plant, with a nameplate capacity of 55 MW. The contract will also include the expansion of the 110 kV transformer station within the Surduc-Siriu Hydropower Development.\u00a0 The project [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-9459","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/9459","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=9459"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/9459\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=9459"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=9459"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=9459"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}