{"id":8973,"date":"2026-02-20T08:01:07","date_gmt":"2026-02-20T08:01:07","guid":{"rendered":"https:\/\/ofero.news\/?p=8973"},"modified":"2026-02-20T08:01:07","modified_gmt":"2026-02-20T08:01:07","slug":"electro-alfa-wins-eur-4-8-mln-contract-from-romanias-hidroelectrica-to-build-pv-park","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=8973","title":{"rendered":"Electro Alfa wins EUR 4.8 mln contract from Romania&#8217;s Hidroelectrica to build PV park"},"content":{"rendered":"<p>Hidroelectrica (BVB: H2O) signed a contract with a consortium led by Electro Alfa International (BVB: EAI) for the construction of an 8.9 MW solar park.<\/p>\n<p>The project envisages the development of a photovoltaic park with an installed capacity of 8.9 MWp and an average production estimated at approximately 11 GWh per year, <a href=\"https:\/\/www.economica.net\/hidroelectrica-va-avea-un-nou-parc-fotovoltaic-de-9-mw-va-fi-construit-de-romani-si-va-fi-gata-peste-un-an_915138.html?mc_cid=38472ec5cd&amp;mc_eid=cd1f92f96c\" target=\"_blank\">Economica.net <\/a>reported.<\/p>\n<p>The contract, worth RON 24.4 million (EUR 4.8 million), was awarded following an open tender procedure, to which four bids were submitted.<\/p>\n<p>The project will be implemented on a turnkey basis and will include design activities, equipment supply, works execution, testing, commissioning, and technical assistance during the warranty period. The duration of the contract is 12 months, of which 2 months will be the design phase and 10 months will be for execution.<\/p>\n<p><em>iulian@romania-insider.com<\/em><\/p>\n<p><em>(Photo source: <a href=\"https:\/\/www.dreamstime.com\/\">Deyangeorgiev\/Dreamstime.com<\/a>)<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Hidroelectrica (BVB: H2O) signed a contract with a consortium led by Electro Alfa International (BVB: EAI) for the construction of an 8.9 MW solar park. The project envisages the development of a photovoltaic park with an installed capacity of 8.9 MWp and an average production estimated at approximately 11 GWh per year, Economica.net reported. The [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-8973","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/8973","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=8973"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/8973\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=8973"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=8973"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=8973"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}