{"id":8742,"date":"2026-02-05T09:00:51","date_gmt":"2026-02-05T09:00:51","guid":{"rendered":"https:\/\/ofero.news\/?p=8742"},"modified":"2026-02-05T09:00:51","modified_gmt":"2026-02-05T09:00:51","slug":"romanias-transelectrica-and-georgian-state-electrosystem-strengthen-cooperation-on-black-sea-submarine-cable-project","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=8742","title":{"rendered":"Romania\u2019s Transelectrica and Georgian State Electrosystem strengthen cooperation on Black Sea submarine cable project"},"content":{"rendered":"<p>Romania\u2019s electricity transmission system operator Transelectrica and Georgia\u2019s Georgian State Electrosystem signed a Memorandum of Understanding on Wednesday, February 4, to advance the development of the Georgia\u2013Romania Black Sea Submarine Cable interconnection project.\u00a0<\/p>\n<p>The memorandum, signed in Bucharest, marks a new stage in the project\u2019s development, which has already completed feasibility studies and has been included in ENTSO-E\u2019s Ten-Year Network Development Plans for 2022 and 2024, with promotion underway for inclusion in the 2026 edition, Transelectrica <a href=\"https:\/\/web.transelectrica.ro\/noutati\/noutati\/647_2026.02.04_18-25-23.pdf?fbclid=IwY2xjawPxNghleHRuA2FlbQIxMABicmlkETBjcUZvemJYb3QzVW45Rnlvc3J0YwZhcHBfaWQQMjIyMDM5MTc4ODIwMDg5MgABHnXl07YHsZJ-zqmn8taBc14XusgM8b0t-XxPjcLS7CYveP1PnSyPWxNacen8_aem_mGJ0DmreRRdSV8vhybuERw\" target=\"_blank\">said<\/a>.<\/p>\n<p>In December 2025, the project was also added to the European Union\u2019s list of Projects of Mutual Interest.<\/p>\n<p>Under the agreement, Transelectrica and GSE will cooperate on preparing and advancing the high-voltage direct current (HVDC) interconnection between Georgia and Romania. The partnership covers coordinated planning, technical and marine studies, environmental and social assessments, financing efforts, and institutional representation at the European and international levels.<\/p>\n<p>\u201cThe signing of this memorandum reflects the maturity and significant progress achieved by the Black Sea Submarine Cable project, as well as Transelectrica\u2019s firm commitment to actively contribute to the development of strategic energy infrastructure for the region. Close cooperation with Georgian State Electrosystem strengthens Romania\u2019s role as a regional energy hub and supports European objectives related to energy security, market integration, and the transition to green energy,\u201d said \u0218tef\u0103ni\u021b\u0103 Munteanu, CEO of the National Electricity Transmission Company Transelectrica SA.<\/p>\n<p>The Black Sea Submarine Cable project is aligned with the Strategic Partnership Agreement on green energy signed in December 2022 by the governments of Azerbaijan, Georgia, Romania, and Hungary. It is expected to contribute to enhanced energy security, diversification of electricity transmission routes, and greater integration of renewable energy sources in the Black Sea region and the European Union.<\/p>\n<p>irina.marica@romania-insider.com<\/p>\n<p>(Photo source: Facebook\/Transelectrica, by\u00a0<em>Emilian Cr\u0103ciun)<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Romania\u2019s electricity transmission system operator Transelectrica and Georgia\u2019s Georgian State Electrosystem signed a Memorandum of Understanding on Wednesday, February 4, to advance the development of the Georgia\u2013Romania Black Sea Submarine Cable interconnection project.\u00a0 The memorandum, signed in Bucharest, marks a new stage in the project\u2019s development, which has already completed feasibility studies and has been [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-8742","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/8742","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=8742"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/8742\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=8742"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=8742"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=8742"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}