{"id":8593,"date":"2026-01-27T09:01:40","date_gmt":"2026-01-27T09:01:40","guid":{"rendered":"https:\/\/ofero.news\/?p=8593"},"modified":"2026-01-27T09:01:40","modified_gmt":"2026-01-27T09:01:40","slug":"eight-bids-submitted-for-final-section-of-romanias-a8-motorway","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=8593","title":{"rendered":"Eight bids submitted for final section of Romania\u2019s A8 motorway"},"content":{"rendered":"<p>The National Company for Road Investments (CNIR) announced on Monday, January 26, that it received eight bids for the construction of the final section of the A8 \u201cUnion\u201d motorway between T\u00e2rgu Neam\u021b, Ia\u0219i and Ungheni. The contract also includes the construction of a 5 km segment in the Republic of Moldova.<\/p>\n<p>Section 4, between DN24 (Ia\u0219i) and the bridge over the Prut River at Ungheni, on the border with the Republic of Moldova, has a length of 15.5 kilometres and an estimated cost of RON 4.7 billion. According to CNIR, funding will be provided through the Security Action for Europe (SAFE) programme.<\/p>\n<p>The eight bids were submitted by a mix of Romanian and international construction groups, including consortia led by Danlin XXL, Far Foundation, Construc\u021bii Erba\u0219u, Itinera, and CONCELEX, as well as single bidders such as AKTOR, Cengiz Insaat, and FCC Construcci\u00f3n.<\/p>\n<p>\u201cThis is a contract financed with European funds through the SAFE programme, and the new element is the 5 km motorway segment in the Republic of Moldova that will be built by Romania. We\u2019re effectively extending the Union motorway beyond the Prut River,\u201d said Gabriel Budescu, Director General of the National Company for Road Investments.<\/p>\n<p>\u201cUnder this contract, CNIR will also award additional points to the contractor who commits to completing, within 18 months, the 2.77 km motorway section between the Gol\u0103ie\u0219ti interchange and the bridge over the Prut at Ungheni,\u201d he added.<\/p>\n<p>The total duration of the contract is set at 46 months, including 10 months for design and 36 months for construction.\u00a0<\/p>\n<p>The project includes the construction of 14 bridges and overpasses, two tunnels &#8211; one measuring 1,760 metres in length &#8211; and two road interchanges, including a future connection to the Ia\u0219i Regional Hospital and Ia\u0219i International Airport, as well as the Gol\u0103ie\u0219ti interchange.<\/p>\n\n<p>irina.marica@romania-insider.com<\/p>\n<p>(Photo source: Facebook\/<em><a href=\"https:\/\/www.facebook.com\/CNIRSA?__cft__%5B0%5D=AZZVZSkD4trfJL_TMWELrx5AEBu4D-NeSJSyDQHHhZj_0UTYMR_CLDdVklkW3NKKeHOJ3uox6r7M51jR1xd4d2WRjzI-cgqunQxL5a9xpqryqGkLgtd6q0dbWFUL9vjA0GSe0RT0GlWF3H6_bwHWRmauIJLI76FvIvrGL2t3h-Pv6kdsIUhJKWF8B0VbOUwANC4&amp;__tn__=-UC*F\">Compania Na\u021bional\u0103 de Investi\u021bii Rutiere<\/a>)<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>The National Company for Road Investments (CNIR) announced on Monday, January 26, that it received eight bids for the construction of the final section of the A8 \u201cUnion\u201d motorway between T\u00e2rgu Neam\u021b, Ia\u0219i and Ungheni. The contract also includes the construction of a 5 km segment in the Republic of Moldova. Section 4, between DN24 [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-8593","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/8593","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=8593"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/8593\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=8593"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=8593"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=8593"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}