{"id":8260,"date":"2025-12-23T07:01:00","date_gmt":"2025-12-23T07:01:00","guid":{"rendered":"https:\/\/ofero.news\/?p=8260"},"modified":"2025-12-23T07:01:00","modified_gmt":"2025-12-23T07:01:00","slug":"omv-petrom-ce-oltenia-kick-off-construction-works-on-four-solar-parks-in-romania","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=8260","title":{"rendered":"OMV Petrom, CE Oltenia kick off construction works on four solar parks in Romania"},"content":{"rendered":"<p>Energy producer OMV Petrom and state-owned energy company Complexul Energetic Oltenia (CE Oltenia) announced that construction works have started on four photovoltaic projects with a total installed capacity of approximately 550 MW.<\/p>\n<p>Located in I\u0219alni\u021ba, Tismana, and Rovinari, the parks are expected to become operational in 2026.<\/p>\n<p>The total investment value for the four photovoltaic parks is over EUR 400 million, with approximately 70% financed through the Modernisation Fund. The first tranche of this financing, in amount of approximately EUR 16 million, was received in December 2025.<\/p>\n<p>OMV Petrom and CE Oltenia, a coal mining and power complex transitioning toward low-carbon energy production, are equal partners in the projects, each holding a 50% stake.<\/p>\n<p>\u201cThrough these projects, OMV Petrom reaffirms its commitment to a low-carbon energy future, contributing to Romania\u2019s and the EU\u2019s climate objectives. We are transforming a region with a long-standing tradition in coal-based energy into a renewable energy hub,\u201d said Franck Neel, member of OMV Petrom\u2019s Executive Board responsible for Gas and Power.<\/p>\n<p><em>simona@romania-insider.com<\/em><\/p>\n<p><em>(Photo source: <a href=\"https:\/\/www.dreamstime.com\/\">Deyangeorgiev\/Dreamstime.com<\/a>)<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Energy producer OMV Petrom and state-owned energy company Complexul Energetic Oltenia (CE Oltenia) announced that construction works have started on four photovoltaic projects with a total installed capacity of approximately 550 MW. Located in I\u0219alni\u021ba, Tismana, and Rovinari, the parks are expected to become operational in 2026. The total investment value for the four photovoltaic [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-8260","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/8260","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=8260"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/8260\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=8260"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=8260"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=8260"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}