{"id":8210,"date":"2025-12-18T12:00:28","date_gmt":"2025-12-18T12:00:28","guid":{"rendered":"https:\/\/ofero.news\/?p=8210"},"modified":"2025-12-18T12:00:28","modified_gmt":"2025-12-18T12:00:28","slug":"romanian-bulgarian-consortium-wins-eur-1-bln-contract-for-bacau-piatra-neamt-express-road","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=8210","title":{"rendered":"Romanian\u2013Bulgarian consortium wins EUR 1 bln contract for Bac\u0103u\u2013Piatra Neam\u021b express road"},"content":{"rendered":"<p>Romania\u2019s National Road Investment Company (CNIR) awarded on Tuesday, December 16, the contract for the design and construction of the Bac\u0103u\u2013Piatra Neam\u021b express road to a Romanian\u2013Bulgarian consortium. The value of the contract is RON 5.17 billion (some EUR 1 billion), excluding VAT, and its signing will take place if no appeals are filed.\u00a0<\/p>\n<p>The express road will connect the municipality of Piatra Neam\u021b to the Moldova Motorway A7 and will have a length of 51 kilometers.<\/p>\n<p>The total duration of the project is 48 months, divided into 12 months for design and 36 months for execution. The warranty of the works is five years.<\/p>\n<p>The award criteria included additional points for the contractor that will hire unemployed persons from the counties of Bac\u0103u and Neam\u021b. The feasibility study estimates the need for a workforce of 1,800 people over the entire duration of the works, according to CNIR director general Gabriel Budescu, cited in the <a href=\"https:\/\/www.cnir.ro\/contract-atribuit-pentru-construirea-drumului-expres-bacau-piatra-neamt\/\">press release<\/a>.<\/p>\n<p>Overall, the express road will include 30 structures (bridges, overpasses, viaducts) with a total length of approximately 16 kilometers. Two of these will exceed 1,000 meters, the longest being the 1,072-meter viaduct located at the road junction connecting to the Moldova Motorway A7, the Bac\u0103u\u2013Pa\u0219cani section.<\/p>\n<p>The project also provides for the construction of five road junctions: a \u201ctrumpet\u201d-type junction at km 0 for the connection with the A7, the Racova junction for the connection with DN 15, the Podoleni junction, the S\u0103vine\u0219ti junction, and the Piatra Neam\u021b road junction.\u00a0<\/p>\n<p>Along the route, S3-type service areas will be arranged on both carriageways, as well as a Maintenance and Coordination Center that will manage the operational maintenance of the road and traffic safety.\u00a0<\/p>\n<p><em><a href=\"mailto:radu@romania-insider.com\">radu@romania-insider.com<\/a><\/em><\/p>\n<p><em>(Photo source: CNIR.ro)<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Romania\u2019s National Road Investment Company (CNIR) awarded on Tuesday, December 16, the contract for the design and construction of the Bac\u0103u\u2013Piatra Neam\u021b express road to a Romanian\u2013Bulgarian consortium. The value of the contract is RON 5.17 billion (some EUR 1 billion), excluding VAT, and its signing will take place if no appeals are filed.\u00a0 The [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-8210","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/8210","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=8210"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/8210\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=8210"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=8210"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=8210"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}