{"id":8085,"date":"2025-12-10T09:00:32","date_gmt":"2025-12-10T09:00:32","guid":{"rendered":"https:\/\/ofero.news\/?p=8085"},"modified":"2025-12-10T09:00:32","modified_gmt":"2025-12-10T09:00:32","slug":"bucharest-heating-supplier-electrocentrale-seeks-contractor-for-eur-400-mln-power-plant","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=8085","title":{"rendered":"Bucharest heating supplier Electrocentrale seeks contractor for EUR 400 mln power plant"},"content":{"rendered":"<p>Electrocentrale Bucure\u0219ti, one of the 17 state enterprises shortlisted by the government for restructuring, has launched the tender for a new gas-fired cogeneration power plant in Bucharest South, a project worth over RON 2.1 billion (EUR 400 million).\u00a0<\/p>\n<p>Interested companies can submit bids until February 5, according to <a href=\"https:\/\/www.economica.net\/noua-centrala-electrica-in-cogenerare-in-bucuresti-la-cet-sud-de-275-mw-si-2-miliarde-de-lei-elcen-a-scos-la-licitatie-contractul_895464.html?mc_cid=978ee46f54&amp;mc_eid=cd1f92f96c\" target=\"_blank\">Economica.net<\/a>. In the bid scoring, the price component will weigh 50%, the rest being technical components, including efficiency and maximum electrical and thermal power that can be charged.<\/p>\n<p>The project involves a power plant with an installed electrical power of 275 MWe and an installed thermal capacity of 214 MWt (185 Gcal\/h), with a gross overall efficiency of the cogeneration unit of 85.8%. The power plant will use natural gas as fuel, with the possibility of operating in a mixture with hydrogen in the future, and will have specific CO2 emissions of a maximum. 235 g\/kWhe.\u00a0<\/p>\n<p>The power plant must be able to ensure secondary control and participate in the technological system services.<\/p>\n<p>&#8220;We are modernising for the future. The project of the new cogeneration plant at CET Sud &#8211; now put out to tender &#8211; will bring in the long term greater energy efficiency, reduced emissions, and stability for the district heating system in Bucharest. An important step in the energy transition of the Capital,&#8221; wrote the interim general director of Elcen, Adrian Tudora, on his Facebook page.<\/p>\n<p>Tenders for the new units at CET Groz\u0103ve\u0219ti and Progresu will follow.<\/p>\n<p><em>iulian@romania-insider.com<\/em><\/p>\n<p><em>(Photo source: <a href=\"https:\/\/www.dreamstime.com\/\">Dmitry Kalinovsky\/Dreamstime.com<\/a>)<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Electrocentrale Bucure\u0219ti, one of the 17 state enterprises shortlisted by the government for restructuring, has launched the tender for a new gas-fired cogeneration power plant in Bucharest South, a project worth over RON 2.1 billion (EUR 400 million).\u00a0 Interested companies can submit bids until February 5, according to Economica.net. In the bid scoring, the price [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-8085","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/8085","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=8085"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/8085\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=8085"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=8085"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=8085"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}