{"id":8059,"date":"2025-12-09T08:02:37","date_gmt":"2025-12-09T08:02:37","guid":{"rendered":"https:\/\/ofero.news\/?p=8059"},"modified":"2025-12-09T08:02:37","modified_gmt":"2025-12-09T08:02:37","slug":"premier-energy-plans-one-to-two-gas-fired-micro-power-plants-in-romania","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=8059","title":{"rendered":"Premier Energy plans one to two gas-fired micro power plants in Romania"},"content":{"rendered":"<p>Bucharest-listed Premier Energy (BVB: PE), controlled by Ji\u0159\u00ed \u0160mejc-funded Emma Capital, in a conference with investors on December 8, announced plans to build a new 20 MW power plant in Romania, in Br\u0103ila, while evaluating the opportunity of another project, according to <a href=\"https:\/\/www.economica.net\/premier-energy-va-construi-o-noua-centrala-pe-gaze-in-romania-si-mai-vrea-inca-una_895193.html?mc_cid=12184efee5&amp;mc_eid=cd1f92f96c\" target=\"_blank\">Economica.net<\/a>. The supplementary units would integrate into and stabilise the company&#8217;s green generation facilities already developed and planned.<\/p>\n<p>Premier Energy already owns and operates, through True Energy Management, a 20 MW balancing and cogeneration plant in Fagaras, Romania, which produced nearly 65,000 MWh in the first nine months of 2025.<\/p>\n<p>Premier Energy officials explained that there is a need for capacities to be used in the balancing market, in the context of large price fluctuations.<\/p>\n<p>&#8220;We will definitely develop one, most likely two additional gas-to-power plants for cogeneration and balancing. We have already selected and committed to a 20 MW site in Br\u0103ila. We are also analysing a second location. The project in Br\u0103ila will most likely start in Q4 2026. We are waiting for some approvals, but it is a very suitable location because it is directly connected to Transgaz, which means that no distribution fee will be paid,&#8221; Premier Energy officials said in the conference call with investors after the presentation of the 9-month results.<\/p>\n<p>&#8220;We are also looking at another location that would have one or two additional advantages: no distribution connection costs, direct connection to Transgaz, and the possibility of supplying heating to a municipality,&#8221; Premier Energy officials also said.<\/p>\n<p>Premier Energy recorded, in the first nine months of 2025, normalised revenues of EUR 1.17 billion, up 40% compared to the same period last year, and normalised EBITDA reached EUR 94 million, 36% above the 2024 level. Its net profit rose to EUR 96 million, three and a half times higher than in the same period last year.<\/p>\n<p>The Premier Energy Group operates through business verticals \u2013 renewable energy production, management, distribution, and supply; and natural gas distribution and supply.<\/p>\n<p><em>iulian@romania-insider.com<\/em><\/p>\n<p><em>(Photo source: <a href=\"https:\/\/www.dreamstime.com\/\">Mirage1\/Dreamstime.com<\/a>)<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Bucharest-listed Premier Energy (BVB: PE), controlled by Ji\u0159\u00ed \u0160mejc-funded Emma Capital, in a conference with investors on December 8, announced plans to build a new 20 MW power plant in Romania, in Br\u0103ila, while evaluating the opportunity of another project, according to Economica.net. The supplementary units would integrate into and stabilise the company&#8217;s green generation [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-8059","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/8059","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=8059"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/8059\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=8059"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=8059"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=8059"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}