{"id":7424,"date":"2025-10-27T13:00:30","date_gmt":"2025-10-27T13:00:30","guid":{"rendered":"https:\/\/ofero.news\/?p=7424"},"modified":"2025-10-27T13:00:30","modified_gmt":"2025-10-27T13:00:30","slug":"western-romania-authorities-sign-contract-for-first-pv-park-in-timisoara","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=7424","title":{"rendered":"Western Romania: Authorities sign contract for first PV park in Timi\u0219oara"},"content":{"rendered":"<p>Timi\u0219oara mayor Dominic Fritz and environment minister Diana Buzoianu signed the financing contract for the construction of the city\u2019s first photovoltaic park, with a value exceeding RON 32 million (EUR 6.29 million), on Monday, October 27.<\/p>\n<p>The new photovoltaic park will have a capacity of 5.6 MW and will produce annually, on average, nearly 7,800 MWh in green energy. The solar panels will be installed on a plot of approximately 20 hectares, located near the Freidorf wastewater treatment plant.<\/p>\n<p>The energy generated will cover about two-thirds of the consumption needed for public lighting in Timi\u0219oara, which will mean a significant reduction in monthly costs, currently estimated at over RON 1.2 million.<\/p>\n<p>In addition to financial savings, the Timi\u0219oara City Hall project will also contribute to reducing greenhouse gas emissions by approximately 4,800 tons of CO2 equivalent annually, according to a City Hall <a href=\"https:\/\/www.primariatm.ro\/2025\/10\/27\/finantare-parc-fotovoltaic\">press release<\/a>.<\/p>\n<p>\u201cThe photovoltaic park will bring direct benefits to the city: lower costs, reduced emissions, and more sustainable infrastructure. It is just one of the projects through which we are transforming Timi\u0219oara into a green and smart city, capable of producing, from renewable sources, a significant portion of the energy it consumes,\u201d said mayor Dominic Fritz.\u00a0<\/p>\n<p>The funds for the PV park come from the Romanian Ministry for Energy. In the upcoming period, the municipality will initiate procedures for launching the procurement of design and construction services.\u00a0<\/p>\n<p>\u201cThe investment is part of a broader plan by the local administration to transition to renewable energy sources and reduce pollution. Among other ongoing projects is the strategic partnership with OMV Petrom, which aims to use geothermal energy for the city\u2019s heating system,\u201d according to the City Hall.<\/p>\n<p><em><a href=\"mailto:radu@romania-insider.com\">radu@romania-insider.com<\/a><\/em><\/p>\n<p><em>(Photo source: Timisoara City Hall press release)<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Timi\u0219oara mayor Dominic Fritz and environment minister Diana Buzoianu signed the financing contract for the construction of the city\u2019s first photovoltaic park, with a value exceeding RON 32 million (EUR 6.29 million), on Monday, October 27. The new photovoltaic park will have a capacity of 5.6 MW and will produce annually, on average, nearly 7,800 [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-7424","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/7424","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7424"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/7424\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7424"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=7424"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=7424"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}