{"id":6288,"date":"2025-08-12T07:05:26","date_gmt":"2025-08-12T07:05:26","guid":{"rendered":"https:\/\/ofero.news\/?p=6288"},"modified":"2025-08-12T07:05:26","modified_gmt":"2025-08-12T07:05:26","slug":"hidroelectrica-revives-45-mw-solar-park-project-in-braila-county","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=6288","title":{"rendered":"Hidroelectrica revives 45 MW solar park project in Br\u0103ila County"},"content":{"rendered":"<p>Romania\u2019s state-owned electricity producer Hidroelectrica has launched a RON 158 million contract for the construction of the Tudor Vladimirescu photovoltaic park in Br\u0103ila County, Energy Tehnologies &amp; System documents show, as reported by <a href=\"https:\/\/www.profit.ro\/povesti-cu-profit\/energie\/hidroelectrica-demareaza-un-proiect-de-parc-fotovoltaic-vechi-de-4-ani-22128033?mc_cid=71a0dc82f2&amp;mc_eid=cd1f92f96c\" target=\"_blank\">Profit.ro<\/a>. The 45 MW project has been on hold since 2012, when the company entered insolvency.<\/p>\n<p>The site covers 55 hectares of land owned by Hidroelectrica for several years, located near Transelectrica\u2019s high-voltage lines and distribution and transformation stations.\u00a0<\/p>\n<p>According to the technical specifications, the contract covers design, manufacturing and procurement, transport and delivery, preparatory works, installation of equipment, on-site testing, and commissioning. The project will be financed from the company\u2019s own funds, with a completion timeline of three years.<\/p>\n<p>Hidroelectrica is seeking to expand its presence in the photovoltaic energy sector. In addition to the Tudor Vladimirescu project, it has signed a contract for the \u201cNuf\u0103rul\u201d floating solar park in Ipote\u0219ti on the Olt River and is planning to acquire four operational projects, targeting a combined solar capacity of 360 MW.<\/p>\n<p>The company already operates the Crucea wind farm and remains Romania\u2019s largest electricity producer, with an installed capacity exceeding 6,400 MW.<\/p>\n<p><em>iulian@romania-insider.com<\/em><\/p>\n<p><em>(Photo source: <a href=\"https:\/\/www.dreamstime.com\/\">Temistocle Lucarelli\/Dreamstime.com<\/a>)<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Romania\u2019s state-owned electricity producer Hidroelectrica has launched a RON 158 million contract for the construction of the Tudor Vladimirescu photovoltaic park in Br\u0103ila County, Energy Tehnologies &amp; System documents show, as reported by Profit.ro. The 45 MW project has been on hold since 2012, when the company entered insolvency. The site covers 55 hectares of [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-6288","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/6288","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=6288"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/6288\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=6288"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=6288"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=6288"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}