{"id":5632,"date":"2025-06-26T07:00:41","date_gmt":"2025-06-26T07:00:41","guid":{"rendered":"https:\/\/ofero.news\/?p=5632"},"modified":"2025-06-26T07:00:41","modified_gmt":"2025-06-26T07:00:41","slug":"one-year-before-deadline-romania-risks-losing-27-of-resilience-facility-funding","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=5632","title":{"rendered":"One year before deadline, Romania risks losing 27% of Resilience Facility funding"},"content":{"rendered":"<p>The European Commission imposed &#8220;firm and rigorous conditions&#8221; for the investments funded under the National Recovery and Resilience Plan (PNRR), and this resulted in an estimated risk of losing EUR 7.8 billion (27%) out of a total envelope of EUR 28.5 billion, former minister of investments and European projects <strong>Marcel Bolo\u015f <\/strong>announced on his Facebook page in a report on &#8220;How Romania stands one year before the deadline.&#8221;<\/p>\n<p>The most hit areas are the health sector (public hospitals particularly), where Romania risks losing EUR 920 million of funding; the environment, with EUR 2.29 billion funding potentially lost, especially water-sewage and waste infrastructure; the education (EUR 728 million); energy efficiency (EUR 1.02 billion), especially energy efficiency in residential buildings intended for the population and public institutions; transport infrastructure (EUR 1.98 billion); digitalization of SMEs and energy renovation in Repower EU (EUR 728 million).<\/p>\n<p>This rigidity was accentuated by Romania&#8217;s fragile fiscal situation, generated mainly by the lack of a correlation between fiscal reforms and those regarding expenditures, but also by the very low pace of implementation of the investments carried out under the Plan, the former minister wrote.<\/p>\n\n<p><em>iulian@romania-insider.com<\/em><\/p>\n<p><em>(Photo source: Inquam Photos\/Sabin Cirstoveanu)<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>The European Commission imposed &#8220;firm and rigorous conditions&#8221; for the investments funded under the National Recovery and Resilience Plan (PNRR), and this resulted in an estimated risk of losing EUR 7.8 billion (27%) out of a total envelope of EUR 28.5 billion, former minister of investments and European projects Marcel Bolo\u015f announced on his Facebook [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-5632","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/5632","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5632"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/5632\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5632"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5632"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5632"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}