{"id":4649,"date":"2025-04-17T07:02:54","date_gmt":"2025-04-17T07:02:54","guid":{"rendered":"https:\/\/ofero.news\/?p=4649"},"modified":"2025-04-17T07:02:54","modified_gmt":"2025-04-17T07:02:54","slug":"omv-petrom-and-ce-oltenia-develop-550-mw-pv-parks-on-site-of-former-coal-mines-in-romania","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=4649","title":{"rendered":"OMV Petrom and CE Oltenia develop 550 MW PV parks on site of former coal mines in Romania"},"content":{"rendered":"<p>OMV Petrom (BVB: SNP), the largest integrated energy producer in South-Eastern Europe, in partnership with Complexul Energetic Oltenia (CE Oltenia), a large coal mining and power complex transitioning toward low-carbon energy production, announced the signing of design and execution contracts for four photovoltaic parks with an installed capacity of 550 MW, according to a note sent by SNP to investors. \u00a0<\/p>\n<p>The projects will be built on land owned by CE Oltenia in Gorj and Dolj counties. \u00a0<\/p>\n<p>The total investment for the four photovoltaic parks exceeds EUR 400 million, of which approximately 70% is financed through the Modernisation Fund. OMV Petrom and CE Oltenia are equal partners in the projects, each holding a 50% stake.<\/p>\n<p>&#8220;The signing of these contracts is a firm step in strengthening our position in the renewable power sector. We have been active in power generation since 2012, from the Brazi gas-fired power plant, which can cover around 10% of Romania&#8217;s electricity production. Through our Strategy 2030, we aim to be a key player in Romania&#8217;s energy transition, with the ambitious target of developing 2.5 GW of capacity, including partnerships, from renewable sources \u2013 wind and solar. We have secured a solid project portfolio, currently in various stages of execution, which will contribute to building the energy system of the future&#8221;, said Frank Neel, Member of the Executive Board of OMV Petrom, responsible for Gas and Power.\u00a0<\/p>\n<p>Two contractors have been selected to implement the projects. \u00a0<\/p>\n<p>A consortium formed by US-based Ameresco and Greece-based Sunel will carry out the design and execution of three of the four photovoltaic parks \u2013 Rovinari, Tismana 1, and Tismana 2 \u2013 with a combined capacity of roughly 460 MW. \u00a0<\/p>\n<p>The fourth photovoltaic park, with a capacity of around 90 MW, will be built by Turkish company Girisim Elektrik on the site of the former CE I\u0219alni\u021ba power plant, on the slag deposit.\u00a0<\/p>\n<p><em>iulian@romania-insider.com<\/em><\/p>\n<p><em>(Photo source: <a href=\"https:\/\/www.dreamstime.com\/\">Stangot\/Dreamstime.com<\/a>)<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>OMV Petrom (BVB: SNP), the largest integrated energy producer in South-Eastern Europe, in partnership with Complexul Energetic Oltenia (CE Oltenia), a large coal mining and power complex transitioning toward low-carbon energy production, announced the signing of design and execution contracts for four photovoltaic parks with an installed capacity of 550 MW, according to a note [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-4649","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/4649","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4649"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/4649\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4649"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4649"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4649"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}