{"id":4489,"date":"2025-04-08T07:02:10","date_gmt":"2025-04-08T07:02:10","guid":{"rendered":"https:\/\/ofero.news\/?p=4489"},"modified":"2025-04-08T07:02:10","modified_gmt":"2025-04-08T07:02:10","slug":"romanias-prime-batteries-to-build-72-mwh-power-storage-facility-for-hidroelectrica","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=4489","title":{"rendered":"Romania&#8217;s Prime Batteries to build 72 MWh power storage facility for Hidroelectrica"},"content":{"rendered":"<p>The consortium formed by battery manufacturer Prime Batteries Technology and the engineering and technical consulting firm Enevo Group, both of them Romanian, won a RON 80 million (VAT excluded) contract to build a power storage facility at Hidroelectrica&#8217;s (BVB: H2O) wind farm Crucea, Hidroelectrica announced in a note to investors. The facility should be commissioned within 12 months.<\/p>\n<p>This investment marks a first for the company, being Hidroelectrica&#8217;s debut project involving Li-ion battery energy storage.<\/p>\n<p>The storage facility will have an absorption\/delivery rate of 36 MW and a storage capacity of 72 MWh.<\/p>\n<p>The main objective of this investment is to reduce internal imbalances within the wind farm in Hidroelectrica&#8217;s portfolio, provide balancing services to the national power system, improve the performance of the wind turbines, and reduce wear and tear on the turbines&#8217; electromechanical systems. The construction of the storage facility will lead to &#8220;smoothing out the imbalances created by the Crucea Nord wind power plant between the forecast and produced energy quantities, due to wind power forecasts.&#8221;<\/p>\n<p>Hidroelectrica opted for the installation of a storage system with dry-cell batteries using lithium-ion technology. The other option considered but ultimately abandoned as less cost-effective, consisted of flow-cell batteries using vanadium-redox technology, according to <a href=\"https:\/\/www.profit.ro\/povesti-cu-profit\/energie\/document-hidroelectrica-lanseaza-primul-proiect-de-stocare-a-energiei-cu-baterii-li-ion-21994860\" target=\"_blank\">Profit.ro<\/a>.<\/p>\n<p><em>iulian@romania-insider.com<\/em><\/p>\n<p><em>(Photo source: <a href=\"https:\/\/www.dreamstime.com\/\">Malpetr\/Dreamstime.com<\/a>)<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>The consortium formed by battery manufacturer Prime Batteries Technology and the engineering and technical consulting firm Enevo Group, both of them Romanian, won a RON 80 million (VAT excluded) contract to build a power storage facility at Hidroelectrica&#8217;s (BVB: H2O) wind farm Crucea, Hidroelectrica announced in a note to investors. The facility should be commissioned [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-4489","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/4489","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4489"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/4489\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4489"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4489"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4489"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}