{"id":4439,"date":"2025-04-03T07:00:53","date_gmt":"2025-04-03T07:00:53","guid":{"rendered":"https:\/\/ofero.news\/?p=4439"},"modified":"2025-04-03T07:00:53","modified_gmt":"2025-04-03T07:00:53","slug":"elsaco-and-electromontaj-win-contract-to-build-145-mw-power-plant-in-southern-romania","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=4439","title":{"rendered":"Elsaco and Electromontaj win contract to build 145 MW power plant in southern Romania"},"content":{"rendered":"<p>The Romanian association Elsaco-Energomontaj is the winner of a tender organized by the Municipality of R\u00e2mnicu V\u00e2lcea for the construction of a gas-fired cogeneration power plant with a capacity of 145 MW on the CET Govora platform, according to <a href=\"https:\/\/economedia.ro\/elsaco-si-energomontaj-vor-construi-in-ramnicu-valcea-o-termocentrala-pe-gaze-de-145-mw-pe-platforma-cet-govora.html?mc_cid=ebf955dda1&amp;mc_eid=607bd7d763\" target=\"_blank\">Economedia<\/a>.<\/p>\n<p>The value of the contract is RON 534 million (EUR 100 million) and the project is financed from the EU budget.\u00a0<\/p>\n<p>The plant will be directly connected to the national gas transport system through a new connection built by Transgaz and to the power grid through Transelectrica&#8217;s Govora station.<\/p>\n<p>The execution period is 25 months from the signing of the work start order, but no later than December 31, 2026. The contract also includes a 24-month warranty.<\/p>\n<p>This contract is supplemented by a smaller one, worth RON 70 million, for constructing a small biomass power plant with a capacity of 5 MW thermal and 1.8 MW electrical on the same platform.<\/p>\n<p><em>(Photo: <a href=\"https:\/\/www.dreamstime.com\/\" target=\"_blank\">Fotofjodor\/ Dreamstime<\/a>)<\/em><\/p>\n<p><em>iulian@romania-insider.com<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>The Romanian association Elsaco-Energomontaj is the winner of a tender organized by the Municipality of R\u00e2mnicu V\u00e2lcea for the construction of a gas-fired cogeneration power plant with a capacity of 145 MW on the CET Govora platform, according to Economedia. The value of the contract is RON 534 million (EUR 100 million) and the project [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-4439","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/4439","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4439"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/4439\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4439"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4439"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4439"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}