{"id":4023,"date":"2025-03-06T09:59:22","date_gmt":"2025-03-06T09:59:22","guid":{"rendered":"https:\/\/ofero.news\/?p=4023"},"modified":"2025-03-06T09:59:22","modified_gmt":"2025-03-06T09:59:22","slug":"eur-1-bln-contract-awarded-for-mountainous-section-of-romanias-a8-highway","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=4023","title":{"rendered":"EUR 1 bln contract awarded for mountainous section of Romania\u2019s A8 highway"},"content":{"rendered":"<p>Romania has awarded the first contract under the National Company for Road Investments (CNIR), selecting a consortium led by SA&amp;PE Construct S.R.L. in partnership with Tehnostrade S.R.L., Spedition UMB, and Euro Asfalt to design and construct Section 1C S\u0103r\u0103\u021beni-Joseni on the A8 Highway, also known as the \u201cUnion Highway.\u201d The contract, worth roughly EUR 1 billion (RON 4.94 billion), marks a significant step in the development of the highway\u2019s mountainous section.<\/p>\n<p>The project will be funded through European grants under the Transport Program 2021-2027 and the state budget.<\/p>\n<p>Spanning 32.4 kilometers through Mure\u0219 and Harghita counties, the section will feature 39 bridges and overpasses, three unidirectional tunnels, four avalanche protection structures, and two wildlife crossings.<\/p>\n<p>Nearly half of the section &#8211; around 16 kilometers &#8211; will consist of tunnels and viaducts, with the longest overpass exceeding 1,700 meters and the highest viaduct reaching 45 meters.<\/p>\n<p>The project also includes two short-term parking areas with 12 charging stations for electric vehicles, as well as temporary exits to ensure independent functionality, CNIR said.<\/p>\n<p>The contract has a completion timeline of 54 months, with 14 months allocated for design and 40 months for construction. It is set to be signed once all necessary procedures are finalized.<\/p>\n\n<p>irina.marica@romania-insider.com<\/p>\n<p>(Photo source: Facebook\/Compania Na\u021bional\u0103 de\u00a0Investi\u021bii Rutiere)<\/p>","protected":false},"excerpt":{"rendered":"<p>Romania has awarded the first contract under the National Company for Road Investments (CNIR), selecting a consortium led by SA&amp;PE Construct S.R.L. in partnership with Tehnostrade S.R.L., Spedition UMB, and Euro Asfalt to design and construct Section 1C S\u0103r\u0103\u021beni-Joseni on the A8 Highway, also known as the \u201cUnion Highway.\u201d The contract, worth roughly EUR 1 [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-4023","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/4023","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4023"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/4023\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4023"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4023"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4023"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}