{"id":2841,"date":"2024-12-03T08:00:02","date_gmt":"2024-12-03T08:00:02","guid":{"rendered":"https:\/\/ofero.news\/?p=2841"},"modified":"2024-12-03T08:00:02","modified_gmt":"2024-12-03T08:00:02","slug":"romania-resumes-efforts-for-procurement-of-h2-powered-trains","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=2841","title":{"rendered":"Romania resumes efforts for procurement of H2-powered trains"},"content":{"rendered":"<p>The Romanian Railway Reform Authority (ARF) has published a tender for 12 hydrogen fuel cell electric trains and their maintenance services for up to 30 years, aligning with the country&#8217;s National Recovery and Resilience Plan (PNRR). Past attempts failed repeatedly.<\/p>\n<p>The contract, valued between RON 1.596 billion and RON 2.468 billion (excluding VAT), aims to bolster sustainable mobility and integrate green technologies into Romania&#8217;s transport infrastructure.<\/p>\n<p>The procurement includes hydrogen-powered vehicles, maintenance, and repair for 15 years, extendable to 30 years, <a href=\"https:\/\/www.economica.net\/arf-trenuri-hidrogen_792591.html?mc_cid=64fa0d27e5&amp;mc_eid=cd1f92f96c\" target=\"_blank\">Economica.net<\/a> reported. The duration of the contract is 225 months. Submissions are due by January 15, 2025.<\/p>\n<p>Past procurement attempts faced setbacks due to non-compliant or absent bids.\u00a0<\/p>\n<p>This relaunch represents a renewed commitment to advance Romania&#8217;s rail modernization goals under the PNRR framework. The adoption of hydrogen trains would not only enhance sustainability but also position Romania as a regional leader in green transportation.<\/p>\n<p><em>iulian@romania-insider.com<\/em><\/p>\n<p><em>(Photo source: <a href=\"https:\/\/www.dreamstime.com\/\" target=\"_blank\">Dreamstime.com<\/a>)<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>The Romanian Railway Reform Authority (ARF) has published a tender for 12 hydrogen fuel cell electric trains and their maintenance services for up to 30 years, aligning with the country&#8217;s National Recovery and Resilience Plan (PNRR). Past attempts failed repeatedly. The contract, valued between RON 1.596 billion and RON 2.468 billion (excluding VAT), aims to [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2841","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/2841","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2841"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/2841\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2841"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2841"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2841"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}