{"id":2292,"date":"2024-10-28T08:05:21","date_gmt":"2024-10-28T08:05:21","guid":{"rendered":"https:\/\/ofero.news\/?p=2292"},"modified":"2024-10-28T08:05:21","modified_gmt":"2024-10-28T08:05:21","slug":"contract-for-two-new-nuclear-reactors-in-romania-ready-to-be-signed","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=2292","title":{"rendered":"Contract for two new nuclear reactors in Romania ready to be signed"},"content":{"rendered":"<p>The primary contract for the construction of new reactors 3 and 4 at Romania\u2019s Cernavod\u0103 nuclear power plant is ready for signing, according to data reviewed by <a href=\"https:\/\/www.profit.ro\/povesti-cu-profit\/energie\/contractul-de-construire-a-reactoarelor-3-si-4-de-la-cernavoda-este-aproape-de-semnare-printre-contractori-compania-mama-a-dezvoltatorului-smr-urilor-sua-de-la-doicesti-21815040\" target=\"_blank\" rel=\"noopener\">Profit.ro<\/a>.\u00a0<\/p>\n<p>The state-controlled project company, EnergoNuclear &#8211; wholly owned by Nuclearelectrica (SNN), Cernavod\u0103\u2019s operator &#8211; is set to finalize the engineering, procurement, and construction management (EPC) agreement with a consortium comprising six companies from Canada, the US, and Italy.<\/p>\n<p>The consortium includes Canada\u2019s Candu Energy, the proprietary developer of the CANDU reactor technology used at Cernavod\u0103, along with two subsidiaries of Texan conglomerate Fluor, the majority shareholder in NuScale, the small modular reactor developer aiming to launch SMR technology at Doice\u0219ti.\u00a0<\/p>\n<p>Additional partners include Italy\u2019s Ansaldo Nucleare and American engineering firms Sargent &amp; Lundy and S&amp;L Engineers.<\/p>\n<p><em>iulian@romania-insider.com<\/em><\/p>\n<p><em>(Photo source: <a href=\"https:\/\/www.dreamstime.com\/\" target=\"_blank\" rel=\"noopener\">Andrea\/Dreamstime.com<\/a>)<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>The primary contract for the construction of new reactors 3 and 4 at Romania\u2019s Cernavod\u0103 nuclear power plant is ready for signing, according to data reviewed by Profit.ro.\u00a0 The state-controlled project company, EnergoNuclear &#8211; wholly owned by Nuclearelectrica (SNN), Cernavod\u0103\u2019s operator &#8211; is set to finalize the engineering, procurement, and construction management (EPC) agreement with [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2292","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/2292","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2292"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/2292\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2292"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2292"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2292"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}