{"id":2181,"date":"2024-10-21T06:00:05","date_gmt":"2024-10-21T06:00:05","guid":{"rendered":"https:\/\/ofero.news\/?p=2181"},"modified":"2024-10-21T06:00:05","modified_gmt":"2024-10-21T06:00:05","slug":"romanias-construction-works-volume-down-4-y-y-in-july-august","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=2181","title":{"rendered":"Romania\u2019s construction works volume down 4% y\/y in July-August"},"content":{"rendered":"<p>The construction works volume index contracted in Romania by 4.0% y\/y in July-August, setting the grounds for a negative performance in Q3 that would reverse the fragile (+0.2% y\/y) advance in Q2.<\/p>\n<p>For the entire January-August period, the construction volume index contracted by 3.1% y\/y, according to data published by the statistics office INS.\u00a0<\/p>\n<p>This comes as a correction after double-digit growth rates in 2022-2023.<\/p>\n<p>Compared to the benchmark year 2021, the monthly average construction works volume in 2024 (seasonally adjusted) was 21% larger despite the 17.3% contraction in the residential buildings segment. The volume of work in the non-residential and civil engineering segments was 23% and 46% larger compared to the 2021 average.<\/p>\n<p>The residential market segment keeps losing ground in the first two months of Q3 2024 (-27.5% y\/y in July-August) and is dragging down the entire sector. For the ytd period, the annual contraction was 23.9% y\/y. However, its weight in total construction works is two to three times lower compared to that of civil engineering works.<\/p>\n<p>The volume of civil engineering works increased by 4.1% y\/y in July-August.\u00a0It is a weaker performance compared to previous quarters \u2013 but such high growth rates (20%-30% y\/y starting with Q3 2022) can not be sustained indefinitely. The Resilience Money and the EU budget must have contributed.<\/p>\n<p>The non-residential segment (-2.2% y\/y in July-August) has been in a negative growth rate since May as well.\u00a0<\/p>\n<p><em>iulian@romania-insider.com<\/em><\/p>\n<p><em>(Photo source: <a href=\"https:\/\/www.dreamstime.com\/\" target=\"_blank\" rel=\"noopener\">Yury Sevryuk\/Dreamstime.com<\/a>)<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>The construction works volume index contracted in Romania by 4.0% y\/y in July-August, setting the grounds for a negative performance in Q3 that would reverse the fragile (+0.2% y\/y) advance in Q2. For the entire January-August period, the construction volume index contracted by 3.1% y\/y, according to data published by the statistics office INS.\u00a0 This [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2181","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/2181","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2181"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/2181\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2181"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2181"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2181"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}