{"id":1371,"date":"2024-08-21T07:03:14","date_gmt":"2024-08-21T07:03:14","guid":{"rendered":"https:\/\/ofero.news\/?p=1371"},"modified":"2024-08-21T07:03:14","modified_gmt":"2024-08-21T07:03:14","slug":"romanias-construction-works-volume-up-a-modest-0-6-y-y-in-q2","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=1371","title":{"rendered":"Romania\u2019s construction works volume up a modest 0.6% y\/y in Q2"},"content":{"rendered":"<p>The volume of construction works in Romania edged up by a modest 0.6% y\/y in Q2, after it plunged by 7% y\/y in Q1, thus ending a six-quarter rally, according to data published by the statistics office.<\/p>\n<p>For the combined H1 period, the volume of construction works is still 2.5% lower compared to the same period last year.<\/p>\n<p>The feeble advance in Q2 was solely due to the civil engineering works (+8.3% y\/y, backed by the government-financed contracts), while the works on residential buildings contracted by 12.5% y\/y and the works on residential buildings by 2.4% y\/y.\u00a0<\/p>\n<p>In a longer-term perspective, the residential buildings segment has lost significant ground (-8.3% in seasonally-adjusted terms) compared to the base year 2021, while the volume of engineering works surged by 55.3%, and the volume of works on non-residential buildings increased by 25.3% compared to the same base year.<\/p>\n<p>By type of projects, the volume of works on new construction objects resumed growth in Q2 (+3.0% y\/y), while the volume of capital and current repairs contracted by 5.0% y\/y and 3.5% y\/y, respectively.<\/p>\n<p><em>iulian@romania-insider.com<\/em><\/p>\n<p><em>(Photo source: <a href=\"https:\/\/www.dreamstime.com\/\" target=\"_blank\" rel=\"noopener\">Jat306\/Dreamstime.com<\/a>)<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>The volume of construction works in Romania edged up by a modest 0.6% y\/y in Q2, after it plunged by 7% y\/y in Q1, thus ending a six-quarter rally, according to data published by the statistics office. For the combined H1 period, the volume of construction works is still 2.5% lower compared to the same [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1371","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/1371","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1371"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/1371\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1371"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1371"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1371"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}