{"id":13093,"date":"2026-11-24T08:00:48","date_gmt":"2026-11-24T08:00:48","guid":{"rendered":"https:\/\/ofero.news\/?p=13093"},"modified":"2026-11-24T08:00:48","modified_gmt":"2026-11-24T08:00:48","slug":"turkey-seeks-to-join-geco-undersea-cable-project-headquartered-in-romania","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=13093","title":{"rendered":"Turkey seeks to join GECO undersea cable project headquartered in Romania"},"content":{"rendered":"<p>The Green Energy Corridor Power Company (GECO), the project company registered in Romania, hosted representatives of the countries involved so far in the EUR 22 billion project: the Republic of Azerbaijan, Georgia, Romania and Hungary, according to <a href=\"https:\/\/e-nergia.ro\/turcia-vrea-sa-intre-in-proiectul-de-22-de-miliarde-de-euro-al-coridorului-verde-in-care-romania-joaca-un-rol-central?mc_cid=602c83c59f&amp;mc_eid=cd1f92f96c\">E-nergia.ro<\/a>.<\/p>\n<p>Representatives of the European Commission, Green Energy Corridor Power Company (GECO), Italian technical consultancy and engineering firm CESI, Romania&#8217;s energy regulator ANRE, the World Bank and the national transmission system operators also took part.<\/p>\n<p><a href=\"https:\/\/www.romania-insider.com\/turkey-seeks-join-geco-undersea-cable-project-headquartered\">Continue reading on Romania Insider<\/a> (Insider+ article).<\/p>","protected":false},"excerpt":{"rendered":"<p>The Green Energy Corridor Power Company (GECO), the project company registered in Romania, hosted representatives of the countries involved so far in the EUR 22 billion project: the Republic of Azerbaijan, Georgia, Romania and Hungary, according to E-nergia.ro. Representatives of the European Commission, Green Energy Corridor Power Company (GECO), Italian technical consultancy and engineering firm [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-13093","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/13093","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=13093"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/13093\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=13093"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=13093"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=13093"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}