{"id":12874,"date":"2026-11-10T08:01:54","date_gmt":"2026-11-10T08:01:54","guid":{"rendered":"https:\/\/ofero.news\/?p=12874"},"modified":"2026-11-10T08:01:54","modified_gmt":"2026-11-10T08:01:54","slug":"romanias-cernavoda-nuclear-plant-shuts-down-both-reactors-again","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=12874","title":{"rendered":"Romania\u2019s Cernavod\u0103 nuclear plant shuts down both reactors again"},"content":{"rendered":"<p>An incident at the plant\u2019s conventional block forced the shutdown of Unit 1, which was already generating electricity, while a sudden drop in the Danube level put preparations for restarting Unit 2 on hold.<\/p>\n<p>In principle, an incident at the plant\u2019s conventional block should not require a lengthy intervention, and such incidents have been reported repeatedly in the past. Nuclearelectrica has not confirmed whether the Danube level would allow Unit 1 to restart quickly, although this should be possible according to previous projections.<\/p>\n<p>Nuclearelectrica announced that both units would resume electricity generation \u201cas soon as possible\u201d. The plant\u2019s experts are working simultaneously to restart Units 1 and 2 and reconnect them to the National Power System.<\/p>\n<p>The remedial work is being carried out in accordance with the applicable procedures at Cernavod\u0103 NPP, without any impact on nuclear safety, personnel or the environment, the company also announced.<\/p>\n<p>Nuclearelectrica will report any developments in accordance with the requirements applicable to a publicly listed company.<\/p>\n<p>Effective December 1, 2026, the technical director of Cernavod\u0103 NPP will be replaced, Nuclearelectrica also announced. The root cause of the incident will be addressed in a subsequent report.<\/p>\n<p>Romania was left without nuclear power generation at Cernavod\u0103 after Unit 1 was shut down at the end of July and Unit 2 was shut down on August 13, due to the low flow of the Danube.<\/p>\n<p>The two reactors, with a combined capacity of approximately 1,400 MW, provided around 20% of electricity consumption during peak periods. Under these conditions, the national energy system relied on wind power, hydropower, and imports.<\/p>","protected":false},"excerpt":{"rendered":"<p>An incident at the plant\u2019s conventional block forced the shutdown of Unit 1, which was already generating electricity, while a sudden drop in the Danube level put preparations for restarting Unit 2 on hold. In principle, an incident at the plant\u2019s conventional block should not require a lengthy intervention, and such incidents have been reported [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-12874","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/12874","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=12874"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/12874\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=12874"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=12874"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=12874"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}