{"id":12800,"date":"2026-11-04T14:00:35","date_gmt":"2026-11-04T14:00:35","guid":{"rendered":"https:\/\/ofero.news\/?p=12800"},"modified":"2026-11-04T14:00:35","modified_gmt":"2026-11-04T14:00:35","slug":"traffic-opens-on-new-13-km-of-bucharests-a0-ring-motorway","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=12800","title":{"rendered":"Traffic opens on new 13 km of Bucharest\u2019s A0 ring motorway"},"content":{"rendered":"<p>Traffic opened on Wednesday, November 4, on another 13 km of Bucharest\u2019s A0 ring motorway, transport minister \u0218tefan-Ovidiu Popa announced. The opening covers lots 3 and 4 of the northern section, between Afuma\u021bi and Glina.<\/p>\n<p>The new road provides a direct link between the A3 Bucharest-Ploie\u0219ti motorway and the A2 Bucharest-Constan\u021ba motorway. According to road infrastructure company CNAIR, the northern semicircle now also connects them to the DN1 national road without requiring drivers to use Bucharest\u2019s older ring road.<\/p>\n<p>\u201cAs of today, 83 kilometers of the 100 km Bucharest ring motorway are open to traffic,\u201d minister Popa said.<\/p>\n<p><a href=\"https:\/\/www.facebook.com\/deputat.stefanovidiupopa\/videos\/1119374987739542\">https:\/\/www.facebook.com\/deputat.stefanovidiupopa\/videos\/1119374987739542<\/a><\/p>\n<p>In his turn, CNAIR general manager Cristian Pistol explained that lot 4, completed during the summer, could only open after work on lot 3 provided a complete connection.<\/p>\n<p>\u201cWe open sections when the connections are complete and safe, not in isolated pieces,\u201d Pistol <a href=\"https:\/\/www.facebook.com\/CristianOvCPistol\/videos\/1656644429434800\">said<\/a>.<\/p>\n<p>Lot 3 was built by CCECC and lot 4 by UMB Spedition. Their combined value is RON 710 million, excluding VAT, with financing provided through Romania\u2019s 2021-2027 Transport Program.<\/p>\n<p>A section of A0 North lot 1 is expected to open by the end of 2026, providing links to the DN1A and DN7 roads, officials also announced. The connection to the A1 motorway is scheduled for completion in the first part of 2027, when the full A0 ring is expected to become operational.<\/p>\n<p>Romania\u2019s high-speed road network has reached 1,490 kilometers following the latest opening, according to the CNAIR general manager.<\/p>","protected":false},"excerpt":{"rendered":"<p>Traffic opened on Wednesday, November 4, on another 13 km of Bucharest\u2019s A0 ring motorway, transport minister \u0218tefan-Ovidiu Popa announced. The opening covers lots 3 and 4 of the northern section, between Afuma\u021bi and Glina. The new road provides a direct link between the A3 Bucharest-Ploie\u0219ti motorway and the A2 Bucharest-Constan\u021ba motorway. According to road [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-12800","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/12800","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=12800"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/12800\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=12800"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=12800"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=12800"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}