{"id":12527,"date":"2026-10-19T08:01:04","date_gmt":"2026-10-19T08:01:04","guid":{"rendered":"https:\/\/ofero.news\/?p=12527"},"modified":"2026-10-19T08:01:04","modified_gmt":"2026-10-19T08:01:04","slug":"constructor-announces-progress-at-romanias-first-green-energy-sports-arena","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=12527","title":{"rendered":"Constructor announces progress at Romania\u2019s first green energy sports arena"},"content":{"rendered":"<p>Work on the \u201cNicolae Dobrin\u201d stadium in Pite\u0219ti, the first sports arena in Romania to operate exclusively on green energy,  is progressing, according to information provided by the company Construc\u021bii Erba\u0219u.<\/p>\n<p>Work to rebuild this stadium began in March 2026. According to the National Investment Company (CNI), the future stadium will have 15,200 seats and host top-level sporting competitions.<\/p>\n<p>The project will include modern facilities for athletes, spectators, the media and officials, alongside complementary spaces, parking facilities and outdoor landscaping.<\/p>\n<p><a href=\"https:\/\/www.facebook.com\/constructiierbasu\/posts\/pfbid09kGF1kFtboMUy2k4fDGbW3h9YF6ezy39jqTsJY4zWhEQg5S2H6pJA7mDtEfetEQ7l?locale=ro_RO\">https:\/\/www.facebook.com\/constructiierbasu\/posts\/pfbid09kGF1kFtboMUy2k4fDGbW3h9YF6ezy39jqTsJY4zWhEQg5S2H6pJA7mDtEfetEQ7l?locale=ro_RO<\/a><\/p>\n<p>\u201cThe \u2018Nicolae Dobrin\u2019 stadium in Pite\u0219ti is increasingly taking on the final shape that has so far only been presented in renderings. We have already installed the prefabricated beams at the North Stand, and we are now preparing the area for the seating tiers,\u201d the constructor said in a press release.<\/p>\n<p>The stadium includes a children&#8217;s and youth training centre and training facilities for related sports (wrestling, boxing, judo and karate), offices, parking facilities and commercial areas. In total, the facilities will span a total floor area of 71,000 sqm.<\/p>\n<p>The constructor has 3 years to complete the project, but progress is already visible. The slab above the parking area is 80% complete, the ground-floor columns have reached 98%, and the plumbing and rainwater drainage systems on this level are 85% complete, the same source added.<\/p>\n<p>\u201cAt the same time, we are working on the floor slabs in the North Stand and East Stand promenade areas and preparing the ground-floor flooring,\u201d Construc\u021bii Erba\u0219u added.<\/p>","protected":false},"excerpt":{"rendered":"<p>Work on the \u201cNicolae Dobrin\u201d stadium in Pite\u0219ti, the first sports arena in Romania to operate exclusively on green energy, is progressing, according to information provided by the company Construc\u021bii Erba\u0219u. Work to rebuild this stadium began in March 2026. According to the National Investment Company (CNI), the future stadium will have 15,200 seats and [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-12527","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/12527","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=12527"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/12527\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=12527"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=12527"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=12527"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}