{"id":11545,"date":"2026-08-14T10:00:42","date_gmt":"2026-08-14T10:00:42","guid":{"rendered":"https:\/\/ofero.news\/?p=11545"},"modified":"2026-08-14T10:00:42","modified_gmt":"2026-08-14T10:00:42","slug":"central-romania-winners-holding-investments-finas-group-commission-100-mwh-energy-storage-battery-after-eur-25-million-investment","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=11545","title":{"rendered":"Central Romania: Winners Holding Investments, Finas Group commission 100 MWh energy storage battery after EUR 25 million investment"},"content":{"rendered":"<p>Cluj-based companies Winners Holding Investments and Finas Group have commissioned the second energy storage battery in their joint portfolio, with a capacity of 100 MWh, following an investment of more than EUR 25 million.<\/p>\n<p>The project, located in Glodeni, in Mure\u0219 County, comes several months after the companies signed a Memorandum of Understanding with China\u2019s equipment producer Sieyuan Electric Co., Ltd., the companies said.<\/p>\n<p>In April, the first unit in the companies\u2019 portfolio, a 10 MWh battery located in Aghire\u0219u, in Cluj County, was completed.\u00a0<\/p>\n<p>A third battery, with a capacity of 200 MWh, is scheduled for completion by November in Jibou, in S\u0103laj County. The project is valued at approximately EUR 45 million.\u00a0<\/p>\n<p>\u201cEach battery brought online represents a concrete step toward a more stable and flexible energy infrastructure for Romania. We thank all our partners and collaborators for their professionalism and support during this challenging period for the energy market, as well as the management team, led by Tudor Strilciuc, for the rigorous implementation of these projects,\u201d Claudiu \u0218ugar, the representative of Winners Holding Investments and Finas Group, said.<\/p>\n<p><em>(Photo: the companies)<\/em><\/p>\n<p><em>simona@romania-insider.com<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Cluj-based companies Winners Holding Investments and Finas Group have commissioned the second energy storage battery in their joint portfolio, with a capacity of 100 MWh, following an investment of more than EUR 25 million. The project, located in Glodeni, in Mure\u0219 County, comes several months after the companies signed a Memorandum of Understanding with China\u2019s [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-11545","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/11545","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11545"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/11545\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11545"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11545"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11545"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}