{"id":11356,"date":"2026-08-03T06:02:09","date_gmt":"2026-08-03T06:02:09","guid":{"rendered":"https:\/\/ofero.news\/?p=11356"},"modified":"2026-08-03T06:02:09","modified_gmt":"2026-08-03T06:02:09","slug":"norways-scatec-acquires-77-mw-onshore-wind-project-in-romania","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=11356","title":{"rendered":"Norway\u2019s Scatec acquires 77 MW onshore wind project in Romania"},"content":{"rendered":"<p>Renewable energy solutions provider Scatec has signed an agreement to acquire the Urleasca onshore wind project in Romania from European renewable energy developer OX2.<\/p>\n<p>The acquisition marks Scatec&#8217;s entry into onshore wind in Europe. It complements the company&#8217;s existing solar portfolio in Romania, which includes the 190 MW Dobrun &amp; Sadova solar projects, currently under construction.<\/p>\n<p>The 77 MW project is located in Br\u0103ila county, in southeastern Romania. It is supported by a Contract-for-Difference (CfD) covering approximately 43 MW of the capacity at an average price of EUR 71.3\/MWh, with the remaining generation to be sold in the Romanian wholesale electricity market.<\/p>\n<p>The Urleasca project was developed by OX2, which will continue to manage the project through to commissioning under a Construction and Asset Transfer Agreement (CATA). Financial close is targeted in Q3 2026, and targeted COD is in the second half of 2028, the company said.<\/p>\n<p>The total project cost is estimated at EUR 168 million excluding VAT, and will be financed by a combination of non-recourse debt and equity, with a leverage of approximately 60%.<\/p>\n<p>Scatec will provide Asset Management and Operations &amp; Maintenance services following commissioning. The transaction is subject to customary conditions.<\/p>\n<p>&#8220;Urleasca is an attractive entry point into European onshore wind. The project has strong fundamentals, long-term revenue visibility through the CfD, and a structured development and construction arrangement with OX2 that gives us a disciplined path to commissioning. Combined with our solar projects already under construction in Romania, this positions Scatec with a more diversified renewable energy portfolio in one of Europe&#8217;s most compelling markets for the energy transition,&#8221; Scatec CEO Terje Pilskog said.<\/p>\n<p>Scatec develops, builds, owns, and operates renewable energy plants, with 6.4 GW generation and 2 GWh storage capacity in operation and under construction across five continents. It is headquartered in Oslo, Norway, and listed on the Oslo Stock Exchange under the ticker symbol SCATC.<\/p>\n<p><em>(Photo: <a href=\"https:\/\/www.dreamstime.com\/\" target=\"_blank\">Welcomia\/ Dreamstime<\/a>)<\/em><\/p>\n<p><em>simona@romania-insider.com<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Renewable energy solutions provider Scatec has signed an agreement to acquire the Urleasca onshore wind project in Romania from European renewable energy developer OX2. The acquisition marks Scatec&#8217;s entry into onshore wind in Europe. It complements the company&#8217;s existing solar portfolio in Romania, which includes the 190 MW Dobrun &amp; Sadova solar projects, currently under [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-11356","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/11356","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11356"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/11356\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11356"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11356"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11356"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}