{"id":10931,"date":"2026-07-06T06:00:44","date_gmt":"2026-07-06T06:00:44","guid":{"rendered":"https:\/\/ofero.news\/?p=10931"},"modified":"2026-07-06T06:00:44","modified_gmt":"2026-07-06T06:00:44","slug":"romanian-nuclearelectrica-reconnects-cernavoda-unit-1-after-planned-two-month-shutdown","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=10931","title":{"rendered":"Romanian Nuclearelectrica reconnects Cernavod\u0103 Unit 1 after planned two-month shutdown"},"content":{"rendered":"<p>Unit 1 of Romania&#8217;s Cernavod\u0103 nuclear power plant, operated by Nuclearelectrica (BVB: SNN), was reconnected to the national power grid on July 5 after completing a two-month planned shutdown programme, the company announced.\u00a0The return of the 700MW reactor is expected to ease pressure on electricity imports during evening peak hours, when solar generation declines.<\/p>\n<p>According to Nuclearelectrica, the shutdown included preventive and corrective maintenance, inspections, mandatory testing, and the implementation of technical upgrade projects.<\/p>\n<p>&#8220;The work related to the planned shutdown programme was carried out in safe conditions for the plant&#8217;s personnel, the public and the environment, according to the approved procedures used at Cernavod\u0103 Nuclear Power Plant,&#8221; the company said, as reported by <a href=\"https:\/\/www.economica.net\/unitarea-1-a-centralei-nucleare-de-la-cernavoda-a-fost-reconectata-la-sen_956525.html?mc_cid=b4f49cdb5f&amp;mc_eid=cd1f92f96c\" target=\"_blank\">Economica.net<\/a>.<\/p>\n<p>Unit 1 entered the planned shutdown on May 10.<\/p>\n<p>Commissioned in 1996, Unit 1 has generated more than 149mn MWh of electricity and helped avoid an estimated 145mn tonnes of CO2 emissions. The reactor has maintained a capacity factor of more than 90%, placing it among the world&#8217;s top-performing nuclear reactors on that measure, according to the company.<\/p>\n<p>Nuclearelectrica operates the two 700MW reactors at the Cernavod\u0103 nuclear power plant and the Pite\u015fti Nuclear Fuel Factory, which manufactures CANDU 6 nuclear fuel.<\/p>\n<p><em>iulian@romania-insider.com<\/em><\/p>\n<p><em>(Photo source: Nuclearelectrica)<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Unit 1 of Romania&#8217;s Cernavod\u0103 nuclear power plant, operated by Nuclearelectrica (BVB: SNN), was reconnected to the national power grid on July 5 after completing a two-month planned shutdown programme, the company announced.\u00a0The return of the 700MW reactor is expected to ease pressure on electricity imports during evening peak hours, when solar generation declines. According [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-10931","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/10931","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10931"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/10931\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10931"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10931"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10931"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}