{"id":10820,"date":"2026-06-29T06:00:31","date_gmt":"2026-06-29T06:00:31","guid":{"rendered":"https:\/\/ofero.news\/?p=10820"},"modified":"2026-06-29T06:00:31","modified_gmt":"2026-06-29T06:00:31","slug":"enevo-group-kraftfeld-to-build-110-mw-battery-storage-project-in-romania","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=10820","title":{"rendered":"ENEVO Group, Kraftfeld to build 110 MW battery storage project in Romania"},"content":{"rendered":"<p>Energy infrastructure company ENEVO Group and Vienna-based energy developer and investor Kraftfeld have signed the contract for the construction of a battery energy storage system &#8211; BESS &#8211; with a rated power of 110 MW and an energy storage capacity of 220 MWh in Dr\u0103g\u0103ne\u0219ti-Olt, in southern Romania\u2019s Olt county, the companies said.<\/p>\n<p>Kraftfeld is the project owner, while ENEVO Group will act as EPC contractor, responsible for the engineering, procurement, and construction of the turnkey BESS system and the associated high-voltage substation.<\/p>\n<p>Construction work is scheduled to begin in Q3 2026, with commissioning planned for early 2027.<\/p>\n<p>The Dr\u0103g\u0103ne\u0219ti-Olt project adds to an ENEVO Group portfolio that now exceeds 1 GWh and includes both under-construction and operational storage projects.<\/p>\n<p>\u201cEnergy storage is no longer optional; it is an essential component in building a resilient and decarbonized energy system,\u201d Eduard Meiloiu, VP Renewables at ENEVO Group, said.<\/p>\n<p>\u201cProjects of this scale are only possible through strong partnerships, trust, and a shared vision of a more sustainable and energy-secure future,\u201d Ben Salm-Reifferscheidt, managing director of Kraftfeld, said.<\/p>\n<p><em>simona@romania-insider.com<\/em><\/p>\n<p><em>(Photo source: press release)<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Energy infrastructure company ENEVO Group and Vienna-based energy developer and investor Kraftfeld have signed the contract for the construction of a battery energy storage system &#8211; BESS &#8211; with a rated power of 110 MW and an energy storage capacity of 220 MWh in Dr\u0103g\u0103ne\u0219ti-Olt, in southern Romania\u2019s Olt county, the companies said. Kraftfeld is [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-10820","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/10820","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10820"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/10820\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10820"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10820"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10820"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}