{"id":10631,"date":"2026-06-16T07:00:27","date_gmt":"2026-06-16T07:00:27","guid":{"rendered":"https:\/\/ofero.news\/?p=10631"},"modified":"2026-06-16T07:00:27","modified_gmt":"2026-06-16T07:00:27","slug":"omv-petrom-green-lights-eur-300-million-solar-and-battery-storage-project-in-bulgaria","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=10631","title":{"rendered":"OMV Petrom green-lights EUR 300 million solar and battery storage project in Bulgaria"},"content":{"rendered":"<p>OMV Petrom (BVB: SNP), the largest integrated energy producer in Southeastern Europe, has taken the final investment decision for Gabare, one of Bulgaria&#8217;s largest integrated solar power and battery storage projects.<\/p>\n<p>Located in the Byala Slatina region, the project will include a photovoltaic plant with a capacity of around 415 MWp and a battery energy storage system &#8211; BESS with storage capacity of approximately 600 MWh.<\/p>\n<p>&#8220;Our first battery storage project marks an important step in the development of a modern energy portfolio, where renewables and flexibility solutions complement each other. At the same time, we are expanding our regional footprint by developing projects in Bulgaria, in addition to Romania,&#8221; said Franck Neel, Member of the OMV Petrom Executive Board responsible for Gas &amp; Power.<\/p>\n<p>The project requires investments of about EUR 300 million, including roughly EUR 100 million earmarked for the battery storage component. Financing will come from the partners&#8217; own resources as well as external sources.<\/p>\n<p>The development will be carried out by Dunav Solar Plant OOD, a joint venture equally owned by OMV Petrom and Austrian renewable energy company Enery.<\/p>\n<p>According to the company, the Gabare project has already secured the necessary permits and has reached the ready-to-build stage. Construction is expected to begin after the signing of the engineering and construction contract, with the first electricity production scheduled for 2028.<\/p>\n<p>OMV Petrom has already secured a power purchase agreement (PPA) under which it will acquire 50% of the solar park&#8217;s future output.<\/p>\n<p>The investment marks OMV Petrom&#8217;s first project combining renewable generation with battery storage and further expands its regional presence beyond Romania.<\/p>\n<p>The company has maintained operations in Bulgaria for many years across the energy value chain, including fuel retail, natural gas trading, and offshore exploration activities in the Black Sea.<\/p>\n<p>OMV Petrom operates a network of 93 filling stations in Bulgaria and, since 2024, has been supplying natural gas to non-household customers in the country through its local subsidiary.<\/p>\n<p><em>iulian@romania-insider.com<\/em><\/p>\n<p><em>(Photo source: Omvpetrom.com)<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>OMV Petrom (BVB: SNP), the largest integrated energy producer in Southeastern Europe, has taken the final investment decision for Gabare, one of Bulgaria&#8217;s largest integrated solar power and battery storage projects. Located in the Byala Slatina region, the project will include a photovoltaic plant with a capacity of around 415 MWp and a battery energy [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-10631","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/10631","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10631"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/10631\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10631"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10631"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10631"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}