{"id":10520,"date":"2026-06-08T12:00:23","date_gmt":"2026-06-08T12:00:23","guid":{"rendered":"https:\/\/ofero.news\/?p=10520"},"modified":"2026-06-08T12:00:23","modified_gmt":"2026-06-08T12:00:23","slug":"central-romania-brasov-fagaras-highway-project-receives-major-environmental-approval","status":"publish","type":"post","link":"https:\/\/ofero.news\/?p=10520","title":{"rendered":"Central Romania: Bra\u0219ov-F\u0103g\u0103ra\u0219 highway project receives major environmental approval"},"content":{"rendered":"<p>The Bra\u0219ov-F\u0103g\u0103ra\u0219 highway passed an important bureaucratic hurdle on Sunday, June 7, after the Bra\u0219ov County Environmental Directorate issued the draft Environmental Agreement for the project worth RON 7.74 billion (EUR 1.47 billion). The approval established strict protection conditions for the sensitive areas crossed by the route.<\/p>\n<p>The highway is designed to pass five localities: the municipality of Codlea and the communes of Dumbr\u0103vi\u021ba, \u0218inca, \u0218ercaia, and M\u00e2ndra. With a design speed of 120 km\/h, the highway will connect Cristian (A3) with the future Sibiu\u2013F\u0103g\u0103ra\u0219 motorway, which is currently under construction.<\/p>\n<p>According to the document issued by the Environmental Directorate, \u201cthe demolition of houses and annexes is not necessary, only of utilities that must be relocated. The route has been designed to avoid the direct impact on existing buildings,\u201d according to local news outlet <a href=\"https:\/\/www.turnulsfatului.ro\/2026\/06\/06\/unda-verde-pentru-autostrada-brasov-fagaras-a-fost-eliberat-acordul-de-mediu-ecoduct-pentru-ursi-fara-lucru-pe-timpul-noptii-si-limita-de-viteza-de-120-km-h-proiectul-va-consuma-peste-26-de-mili\/\">Turnul Sfatului<\/a>.<\/p>\n<p>However, the land footprint is massive, at around 561 hectares. The targeted land includes arable land (334 ha), grasslands (137 ha), and forest areas (44 ha).<\/p>\n<p>The motorway crosses areas of \u201ccritical ecological importance,\u201d such as the Natura 2000 site ROSAC0352 Per\u0219ani, where a major corridor for brown bears, wolves, and lynxes has been identified. To avoid habitat fragmentation, the project includes a 300m cut-and-cover tunnel serving as an ecoduct.<\/p>\n<p>The difficult terrain requires the design of impressive engineering structures. A total of 16 viaducts and 18 bridges will be built. Moreover, to protect watercourses (\u0218ercaia, Vene\u021bia, H\u00e2rtibaciu), the highway will reportedly be equipped with an ultra-dense treatment system made up of \u201c415 sedimentation basins and 415 oil and grease separators.\u201d<\/p>\n<p>The highway is set to start in the northern area of the municipality of Bra\u0219ov, near the road junction that will ensure the connection with Highway A3 (the R\u00e2\u0219nov-Cristian section). From here, the route proceeds northwest, crossing the Bra\u0219ov metropolitan area and quickly leaving the urban zone, following alignments optimized for motorway speeds of 120 km\/h.<\/p>\n<p>Roughly 4.7 million cubic meters of concrete, 627,000 tons of asphalt mixtures, and 1.6 million tons of cement will go into the Bra\u0219ov-F\u0103g\u0103ra\u0219 highway, according to the publication.<\/p>\n<p>The construction phase, estimated at 36 months, will be subject to strict requirements. \u201cConstruction site activities will be carried out exclusively between 7 AM and 10 PM,\u201d according to the documents, and the speed of construction machinery will be limited to 30 km\/h. Similarly, works involving soil handling will be prohibited during periods with strong winds.<\/p>\n<p><em><a href=\"mailto:radu@romania-insider.com\">radu@romania-insider.com<\/a><\/em><\/p>\n<p><em>(Photo source:\u00a0Compania Nationala de Administrare a Infrastructurii Rutiere on Facebook)<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>The Bra\u0219ov-F\u0103g\u0103ra\u0219 highway passed an important bureaucratic hurdle on Sunday, June 7, after the Bra\u0219ov County Environmental Directorate issued the draft Environmental Agreement for the project worth RON 7.74 billion (EUR 1.47 billion). The approval established strict protection conditions for the sensitive areas crossed by the route. The highway is designed to pass five localities: [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-10520","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/10520","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10520"}],"version-history":[{"count":0,"href":"https:\/\/ofero.news\/index.php?rest_route=\/wp\/v2\/posts\/10520\/revisions"}],"wp:attachment":[{"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10520"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10520"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ofero.news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10520"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}